Education
Gull Lake High School
Richland, Michigan
www.gulllakecs.org
Facility: High School
Function: Education 9-12
Services:Heating and Cooling Systems including Boiler, hydronics, HVAC, Controls, Sheet Metal, Science Laboratory Air, Gas, and Acid Waste Piping Systems, Domestic Water,
Sanitary Piping, and Stormwater Management Systems
Contract: $4,800,000
Architect: Kingscott Associates, Kalamazoo, MI
www.kingscott.com
Contractor: Miller-Davis Company, Kalamazoo, MI
Details: Gull Lake High School in Richland, MI, is a model of new-age design in education facilities, including its innovative mechanical systems designed to promote energy efficiency while ensuring optimal heating, cooling, and ventilation to provide healthy, comfortable, flexible learning and gathering spaces. The project included full mechanical systems construction, including boiler, hydronics, HVAC, controls, sheet metal, science laboratory air, gas, and acid waste piping, water, sanitary drainage, and stormwater management systems. The school features four one-story wings, library, cafeteria, and a two-story gymnasium.
Featured projects including the one above are from the collective career experience of our leadership team.
© Phoenix Mechanical | Site Map

